We protect your tools
with strong engineering.
Since 2015, Bursa-based TAİS Automotive has delivered robust engineering solutions in overseas procurement, project management and home-line integration of press tools for global OEMs. We're not a broker — we're the engineering partner who protects your tooling investment end to end.
We're not a broker, we're not a salesman — we protect your tools with strong engineering.
TAİS Automotive is a Turkey-based company offering robust solutions in overseas procurement, project management and home-line integration of sheet metal press tools. We make sure all options are considered and the most robust solution is delivered for your company and project.
Across sheet metal forming, body stamping and chassis components, we provide on-site supervision and support at every stage — from feasibility through to commissioning. Our quality management system is certified to ISO 9001:2015.
From feasibility to commissioning
Five stages, matching sections S-02–S-06 of our General Information Catalog — every tooling project is run with the same discipline from kickoff to production sign-off.
Strategy, Organization & Control
Starts with tooling realisation APQP, a weekly-updated master timing plan, process layout and CAE review, tool design review, raw material requisition, gauge concept/design review and development planning; continues with visual component tracking, static and dynamic tool buy-off, 6-piece Level 2 CMM control and a 30-piece SPC capability study.
Feasibility & Process Analysis
We determine the best forming method using simulation software and our in-house experts. Any negative results from the simulation are reported, along with our development recommendations. We develop appropriate processes for progressive, tandem and transfer dies, and prepare all data required for tool design.
Tool Design & Review
Die designs are prepared according to press type and product process — specifically to FORD, RENAULT, VW GROUP, AUDI, BMW and FIAT standards. Die structure is checked with section reviews and crash tests for kinematic control, and designs are checked against more than a hundred questions so most issues are eliminated before customer review.
Production Planning, Follow-up & Reporting
We plan and initiate the process from tool build to serial approval, following dynamic, static and quality controls and reporting with visual material (photo, video) at customer-determined phases. Using our extensive tooling network across Turkey, China and Korea, we determine the most appropriate tooling and follow the process through to completion.
Final Review, Correction & Commissioning
We complete all dynamic, static and quality controls before the die leaves the tool supplier, providing our own inspection reports to minimize potential problems. Geometric (CMM) and cosmetic (visual audit) control reports are analyzed and necessary actions (CCAR) are shared to eliminate any detected issues.
ISO 9001:2015 certified since 12 January 2019
Every stage from feasibility to commissioning is documented with dynamic, static and geometric (CMM) controls; results are shared with the customer through visual material (photo/video), and every detected deviation is closed out with a CCAR.
Let's talk about your project
Tooling procurement, project management or line integration — send us your requirement and our team will get back to you shortly.
info@tais.com.tr